Hardtwood
Serving The Hamptons

Solid Wood for the East End

A large share of our residential work heads east: designer-specified walnut islands in Southampton kitchens, 12-foot live edge dining tables for East Hampton great rooms, white oak vanities for Sag Harbor renovations.

We schedule East End deliveries around house openings and install crews, and we’re used to working designer-to-shop — send the spec sheet, get a hand-built quote, and have the piece arrive finished, cured, and ready to set.

Delivery: Scheduled white-glove delivery to Southampton, East Hampton, Sag Harbor, Montauk, and the rest of the East End, timed to your project calendar. Current production lead time is 3–4 weeks.

Price Your Piece InstantlySee Transparent Pricing

What We Build

  • Hardwood CountertopsMade-to-order solid wood countertops with food-safe, zero-VOC finishes. Sink and stove cutouts available.
  • Hardwood Table TopsCustom solid hardwood tabletops (face grain, live edge, and round) milled to your dimensions in Farmingdale, NY.
  • Dining TablesComplete solid hardwood dining tables, built to order in New York.
  • Hardwood Floating ShelvesSolid hardwood floating shelves with optional hidden bracket systems, sized to the inch.
Questions

The Hamptons Questions

Do you work with Hamptons designers and builders?
Yes — much of our East End work arrives as a designer’s spec. Trade accounts get tier pricing, direct shop communication, and delivery scheduled around the install crew.
Can you build oversized dining tables for great rooms?
Yes. Long spans are our specialty — the Builder prices any size instantly, and steel C-channel reinforcement keeps 10-to-14-foot tops flat for life.
When should I order for a summer deadline?
Work back from Memorial Day: with typical production time plus East End delivery scheduling, orders placed by early spring comfortably make the season.
Do you take on custom or one-off projects?
Yes. Beyond the online builder, we take on custom sizes, oversized pieces, matched commercial runs, and bespoke solid-hardwood millwork. Tell us what you have in mind and we’ll quote it by hand, usually within one business day. Start a custom project ›
Made in Farmingdale, NY
Made to order
100% zero-VOC finishes
Responsibly sourced hardwood
Lead time 5–6 weeks